The Phase III Bedtower Addition to Atrium Health’s Pineville Campus is a seven-story maternity expansion that is designed to expand to add an 8th floor. The exterior skin is composed of prefabricated paneling designed to coordinate with the vernacular of the campus. The patient rooms are part of Atrium Health’s room standardization initiative, and are prefabricated pods that are set along a 16’ wide corridor that supports nursing functions. Existing Plant Operations, Clinical Engineering, Dietary, and Pharmacy Departments are renovated and expanded due to the increased loads from the additional 108 beds.